Vasquez v Urbahn Assoc. Inc.
2010 NY Slip Op 09076 [79 AD3d 493]
December 9, 2010
Appellate Division, First Department
As corrected through Wednesday, February 16, 2011


Christian Vasquez, Respondent-Appellant,
v
Urbahn AssociatesInc., Defendant, and Great American Contracting Corp. et al., Appellants-Respondents. (And aThird-Party Action.)

[*1]Shaub, Ahmuty, Citrin & Spratt, LLP, Lake Success (Robert M. Ortiz of counsel), forappellants-respondents.

Gorayeb & Associates, P.C., New York (Mark H. Edwards of counsel), forrespondent-appellant.

Order, Supreme Court, New York County (Edward H. Lehner, J.), entered August 6, 2009,which granted the motion of defendants Great American Contracting Corp. and Home Again in HarlemLLC for summary judgment dismissing the complaint only insofar as it sought to dismiss the Labor Law§ 241 (6) cause of action, and granted plaintiff's cross motion for summary judgment on the issueof liability on his Labor Law § 240 (1) claim, modified, on the law, the cross motion denied, themotion denied as to the Labor Law § 241 (6) cause of action, and, upon a search of the record,plaintiff granted summary judgment on the issue of liability on his Labor Law § 241 (6) cause ofaction insofar as it is premised upon a violation of Industrial Code (12 NYCRR) § 23-3.3 (c),and otherwise affirmed, without costs.

12 NYCRR 23-1.7 (f) imposes a duty upon a defendant to provide a safe staircase, free of defects(Murphy v American Airlines, 277 AD2d 25, 26 [2000] [defendant granted seeking summaryjudgment on plaintiff's Labor Law § 241 (6) claim based upon a violation of 12 NYCRR 23-1.7(f) when plaintiff was not injured as a result of a defect in the staircase or debris left thereon]; see also McGarry v CVP 1 LLC, 55 AD3d441, 442 [2008]). The conflicting evidence as to whether the stairs were defective raises aquestion of fact with respect to whether 12 NYCRR 23-1.7 (f) was violated by the defendants.Summary resolution of this issue is thus precluded.

However, it is clear, upon a search of the record, that defendants violated 12 NYCRR 23-3.3 (c)and plaintiff is entitled to summary judgment to the extent that this section of the Industrial Code servesas a predicate for his Labor Law § 241 (6) claim (see Cardenas v One State St., LLC, 68 AD3d 436, 438 [2009];Gawel v Consolidated Edison Co. of N.Y., 237 AD2d 138, 138 [1997]). 12 NYCRR 23-3.3(c) mandates "continuing inspections . . . by designated persons as the work progresses todetect any hazards to any person resulting from weakened or [*2]deteriorated floors or walls or from loosened material" and is explicitlyaimed at preventing persons from working "where such hazards exist until protection has been providedby shoring, bracing or other effective means." Defendants failed to demonstrate that the mandatedinspections were conducted, since their evidence on this issue consisted solely of an affidavit by thegeneral contractor's project manager, which was at odds with her deposition testimony. When theproject manager was deposed, she recalled very little about the project or the accident, continuallyoffering responses such as "I don't know," or "I don't recall." Specifically, she did not recall how oftenshe visited the building, when or even whether she visited the building during the demolition phase,whether an engineering survey was performed before the demolition began, whether she ever met withany engineers in connection with the project, what type of flooring was in place, whether she observedany rotting floors or missing sections of flooring, whether there were any vertical columns supporting thebuilding, whether she prepared any inspection reports regarding the building's interior, whether therewas a safety plan or any meetings or discussions regarding safety, and whether regular inspections wereconducted. Miraculously, in her affidavit, proffered in support of defendants' motion for summaryjudgment and prepared a year after her deposition, the project manager recalled conductingwalk-through inspections of the building on a regular basis, such that she was now able to establishdefendants' compliance with 12 NYCRR 23-3.3 (c). Clearly, her affidavit was tailored to supportdefendants' motion for summary judgment and to oppose plaintiff's cross motion seeking the same relief.Under these circumstances, the affidavit cannot be accorded any weight and fails to raise an issue offact (see Lupinsky v Windham Constr. Corp, 293 AD2d 317, 318 [2002]; Joe v OrbitIndus., 269 AD2d 121, 122 [2000]; Phillips v Bronx Lebanon Hosp., 268 AD2d 318,320 [2000]). Since, as indicated above, plaintiff's evidence established that no such inspections wereconducted, plaintiff is entitled to summary judgment on the issue of liability under Labor Law §241 (6) predicated upon a violation of 12 NYCRR 23-3.3 (c).

As to the Labor Law § 200 and the common-law negligence causes of action, liabilitygenerally lies if a defendant created the dangerous condition alleged or had prior notice of the same (Mitchell v New York Univ., 12 AD3d200, 201 [2004]; Paladino v Society of N.Y. Hosp., 307 AD2d 343, 345 [2003]). Sincethere exists an issue of fact as to whether these defendants had prior notice that the stairs weredefective and thus a question as to whether it was foreseeable that they could fail or collapse, summaryjudgment in defendants' favor and with respect to plaintiff's common law negligence and Labor Law§ 200 claim was properly denied.

Whether the collapse or failure of a permanent structure gives rise to liability under Labor Law§ 240 (1) turns on whether "the risk of injury from an elevation-related hazard [is] foreseeable"(Jones v 414 Equities LLC, 57 AD3d65, 75 [2008]; see also Espinosa vAzure Holdings II, LP, 58 AD3d 287, 291 [2008]). While plaintiff testified that the building inwhich he was injured was in a dilapidated condition before the commencement of the demolition workand that the stairs which collapsed, causing his accident, were "old" and "all like destroyed," SegundoMaldonado, president of the company which employed plaintiff, testified that the stairs were "solid" and"in good condition" prior to plaintiff's accident. Accordingly, a question of fact exists as to whether thecollapse of the permanent stairs was foreseeable. This material issue of fact thus precludes summaryjudgment on plaintiff's claim pursuant to Labor Law § 240 (1).

The dissent takes the untenable position that in denying plaintiff's cross motion for summaryjudgment on his claim pursuant to Labor Law § 240 (1), we continue to require a [*3]statutorily unsupported foreseeability element. Not only is the dissent'sposition unsupported by this court's well reasoned precedent (see Jones v 414 Equities LLC,57 AD3d at 75; Espinosa v Azure HoldingsII, LP, 58 AD3d 287, 291 [2008]), but by precedent in the Second Department(Shipkoski v Watch Case Factory Assoc., 292 AD2d 587, 589 [2002]), and the Court ofAppeals (Gordon v Eastern Ry. Supply, 82 NY2d 555, 562 [1993] ["(t)o establish a primafacie case (of a violation of Labor Law § 240 [1]) plaintiff need not demonstrate that the precisemanner in which the accident happened or the injuries occurred was foreseeable; it is sufficient that hedemonstrate that the risk of some injury from defendants' conduct was foreseeable" (emphasisadded)]). While it is true that Labor Law § 240 (1) fails to mention any foreseeabilityrequirement as a predicate to its violation, a foreseeability requirement must necessarily be imputed asto every claim pursuant thereto, when as here, the claim is premised on a collapsing permanentstructure. Labor Law § 240 (1) applies when there is an inherent risk in the task beingperformed "because of the relative elevation at which the task must be performed or at which materialsor loads must be positioned or secured" (Rocovich v Consolidated Edison Co., 78 NY2d 509,514 [1991]). Thus, "[t]he contemplated hazards are those related to the effects of gravity whereprotective devices are called for either because of a difference between the elevation level of therequired work and a lower level or a difference between the elevation level where the worker ispositioned and the higher level of the materials or load being hoisted or secured" (id. at 514).Since permanent structures, such as the stairs here, are normally not expected to collapse or fail, workbeing performed thereon, much like work performed at ground level and not involving the hoisting orsecuring of materials, does not usually expose a worker to a gravity-related hazard. Accordingly, only ifa defendant has reason to foresee that the permanent structure is likely to collapse, does it then have tocomply with the mandates of Labor Law § 240 (1) by providing the safety devices enumeratedtherein. To hold otherwise, as proposed by the dissent, nonsensically imposes liability upon a defendantwhen the work being performed does not expose a worker, at the outset, to a gravity related hazard;the hallmark of liability under Labor Law § 240 (1).

Zimmer v Chemung County Performing Arts (65 NY2d 513 [1985]) does not alter ourholding because it fails to address the pertinent issue. Of course it is true, as the court held inZimmer, that when safety devices are required pursuant to Labor Law § 240 (1),circumstantial reasonableness plays no role in the analysis related to the failure to provide such devices(65 NY2d at 523). However, the issue here is not whether defendants acted reasonably in failing toprovide safety devices when the circumstances so warranted, but rather whether it was foreseeable thatthe work being performed exposed plaintiff to a gravity-related hazard such that safety devices shouldhave been provided in the first place.

The dissent's second position, while sound public policy, is both legally and factually untenable.While as a policy matter, a defendant who takes a head-in-the-sand approach should not be rewardedfor such gross neglect, we find no support for the dissent's imputation of foreseeability solelybecause a defendant takes no steps which would enable him or her to foresee that an accident is likely.Foreseeability is "[t]he risk reasonably to be perceived . . . ; it is risk to another or toothers within the range of apprehension" (Palsgraf v Long Is. R.R. Co., 248 NY 339, 344[1928]). Assuming, arguendo, that the defendants here took no steps to ascertain the [*4]condition of the building wherein plaintiff worked, we nonethelessdisagree that this, by itself, leads to a finding of foreseeability as a matter of law since in such case,albeit through their own neglect, and barring other avenues of notice, defendants would have had noreason to perceive or apprehend prior to the accident that the stairs were in a condition such that theywere likely to collapse. A review of the record further weakens the dissent's position, since whiledefendants may not have undertaken inspections to the extent urged by the dissent, or to the extentnecessary to satisfy the "continuing inspections" requirement promulgated by 12 NYCRR 23-3.3 (c),defendants did in fact inspect the premises prior to plaintiff's accident, including the stairs and beamssupporting them, thereafter concluding that they were sound. Based on this record, whether thisaccident was foreseeable so as to require defendants to provide the safety devices mandated by LaborLaw § 240 (1) is a question of fact. We have considered the parties' remaining arguments foraffirmative relief and find them unavailing. Concur—Nardelli, J.P., McGuire, and RomÁn,JJ.

Acosta and Freedman, JJ., dissent in part in a memorandum by Acosta, J., as follows: Because Ibelieve that the majority is reading into Labor Law § 240 (1) an element that is found nowhere inthe statute, I respectfully dissent, and would grant plaintiff's cross motion for summary judgment on theissue of liability under Labor Law § 240 (1). The majority's position is that a plaintiff bears theburden of demonstrating that a particular injury was foreseeable. In so ruling, the majority misreads theCourt of Appeals holding in Gordon v Eastern Ry. Supply (82 NY2d 555 [1993]). InGordon, the Court of Appeals explicitly held that a "plaintiff need not demonstrate that theprecise manner in which the accident happened or the injuries occurred was foreseeable; it is sufficientthat he demonstrate that the risk of some injury from defendant's conduct was foreseeable"(id. at 562 [emphasis added]). Thus, the statute imposes no requirement that a particularaccident be foreseeable, as urged by the majority. It is enough that given the inherently dangerousconditions of work sites, it is foreseeable that an owner or contractor's failure to provide safety devicesto workers, as here, may create an injury. Significantly, the plaintiff in Gordon was not injuredas a result of hitting the ground when he fell off his ladder, but rather because he lost control of asandblaster which, due to a defective trigger, continuously sprayed plaintiff with sand. According to thedefendant in Gordon, the injury was unforeseeable. Although the plaintiff was provided with aladder, the Court held that defendants could not avoid liability under Labor Law § 240 (1) sincethe core objective of the statute was not met—namely, preventing plaintiff from falling. Sincedefendants in Gordon failed to provide the proper safety devices to the plaintiff, it was of nomoment that the exact injury suffered by plaintiff was not foreseeable. The injury, the Courtheld, "was a foreseeable result of [performing covered activity] from an elevated position" (id.at 562).[FN1]The breach of the [*5]statute by defendants was sufficient to findliability. Under the majority's rationale, plaintiff's section 240 (1) claim in Gordon would havebeen dismissed.

The plain language of Labor Law § 240 (1) mandates that in the demolition of a"structure," contractors and owners "shall furnish" safety devices to workers (emphasisadded). Nowhere is there a requirement that owners and contractors have to supply safety devices onlywhen they divine there is a foreseeable risk of injury in a particular task because of the employee'srelative elevation. Nor, as the majority urges, is there a distinction in the statute between a permanentstructure and a temporary structure.

The majority heavily relies on Jones v414 Equities LLC (57 AD3d 65 [2008]) wherein this Court held that a plaintiff who wasengaged in a protected activity (demolition work) at the time of his accident was not entitled tojudgment as a matter of law where he failed to demonstrate that the collapse of the floor on which hewas standing was foreseeable. I concurred with the majority opinion in Jones. However, upona closer examination of the statute and in the absence of any Court of Appeals case directly on point, Inow believe that a better approach would be to not read into the statute a foreseeability requirement,lest we encourage contractors, as here, to take a head-in-the-sand approach to their statutoryobligations.

Moreover, given the dangerous conditions of construction and demolition sites, imposing aforeseeability requirement may result in unnecessary and preventable injuries to workers. Placing onplaintiffs the burden to demonstrate a particular accident was foreseeable disturbs the balance struck bythe Legislature between employee safety and employer cost in promulgating this absolute liabilitystatute. It is hardly within the ambit of this Court's majority to change this very important legislativechoice.

Indeed, reading such a requirement into the statute goes directly against the legislative intent. Forinstance, the sponsors of the 1969 amendments to the Labor Law made it absolutely clear that "[t]heLabor Law was enacted for the sole purpose of protecting workmen" (Mem of Sen Calandraand Assemblyman Amann, 1969 NY Legis Ann, at 407 [emphasis added]). The Court of Appeals hasrecognized this legislative intent of placing ultimate responsibility for safety on owners and generalcontractors, rather than workers who "are scarcely in a position to protect themselves from accident"(Zimmer v Chemung County Performing Arts, 65 NY2d 513, 520 [1985] [citation omitted]).

The Court of Appeals has also held that "this statute is one for the protection of workmen frominjury and undoubtedly is to be construed as liberally as may be for the accomplishment of thepurpose for which it was thus framed" (id. at 520-521) [emphasis added]). Reading into thestatute a foreseeability requirement would, therefore, not only limit the scope of the statute and goagainst Court of Appeals guidance on the issue, but also fly in the face of the statute's legislative intent,which primarily is to ensure the safety of workers, not to limit contractor liability to accidents that areforeseeable.[FN2][*6]

In any event, were foreseeability a required element, I wouldnevertheless find that plaintiff has demonstrated that he is entitled to summary judgment on his LaborLaw § 240 (1) claim. This case is clearly distinguishable from Jones v 414 Equities LLC (57 AD3d65 [2008]), on which the majority relies. In Jones, the building's permanent wooden floorswere not to be removed during the renovation of the building. In the present case the flooring of theentire building was to be removed as part of the renovation. Jackhammers were employed, andrenovation necessitated making holes in the side walls to loosen and remove beams, which clearlycompromised the integrity of the floors.

Moreover, unlike the building in Jones, the building here had a hole in the roof, thusexposing the floors to the elements. The building had been abandoned by the City since 1974, until itwas purchased by the owner from the City in 2003 in "as is" condition for $1. Thus, the building sat forthree decades with no maintenance whatsoever. There is no indication that this was the case inJones. Given all these factors, I believe it is glaringly evident that the type of accident thatoccurred was indeed foreseeable.

Most troubling to me, however, is the fact that the general contractor and the owner took ahead-in-the-sand approach to their safety obligations, and now cavalierly claim that the accident wasnot foreseeable. There is no indication whatsoever that the general contractor or owner took anyreasonable step to ensure the safety of their workers.

For instance, the principal of the entity hired by the general contractor to perform the demolitionand debris removal work testified that there was no engineering survey performed by a qualifiedstructural engineer before the work began. This survey is essential to determine the stability of theinterior and the risk of an unplanned collapse. He further testified that he never saw any inspectionreports from any inspections of the flooring, that there was no safety officer, and he was not aware ofany safety meetings having been held with employees. Significantly, he testified that the structuralintegrity of the floors was checked by merely walking on them.

Plaintiff's expert affidavit, on the other hand, made clear that proper inspection and safetyprocedures for a construction project of this magnitude were not in place, and that, to the extent thatany inspections were performed at all, they were not done by a professional structural engineer qualifiedto evaluate the changing structural conditions of the building. It is thus clear that defendants did not eventake minimal precautions at the work site. I do not believe that defendants' failure to ensure theirworkers' safety should now allow them to claim the accident was not foreseeable. This Court should becautious in making Labor Law § 240 (1) claims contingent on foreseeability lest employersignore the safety of their workers behind the shield of foreseeability. Preventive measures in line with thespirit of Labor Law § 240 (1) will undoubtedly prevent certain injuries, and employers would bewise to protect their workers rather than expend resources on unnecessary litigation.

The majority's position that an owner or contractor can completely ignore any safety hazards in awork site completely obfuscates the purpose of the "extreme protection" afforded by [*7]the statute, and defies logic. If the majority's reasoning is accepted, nomatter how obvious a condition may be, if an owner or contractor simply asserts that it did not know ofthe condition because it took no preventive measure whatsoever, it will be insulated from liability. Suchreasoning turns the Labor Law completely on its head.

The majority cites to the universally recognized Palsgraf case to define foreseeability as"[t]he risk reasonably to be perceived . . . ; it is risk to another or to others withinthe range of apprehension" (Palsgraf v Long Is. R.R. Co., 248 NY 339, 344 [1928][emphasis added]). Yet, in the same breath the majority urges that through "neglect" a defendant willhave no obligation to perceive a dangerous situation. I do not believe Judge Cardozo meant to definereasonableness as looking the other way. The majority's conclusion here is that whether this accidentwas foreseeable is a question of fact. However, this question would have to be resolved by determiningwhether defendants knew or should have known of a dangerous condition had they takenreasonable steps. Unfortunately, based on the majority's logic, whether defendants should haveknown of the perilous condition is irrelevant, inasmuch as the majority makes clear that "albeit throughtheir own neglect . . . defendants would have had no reason to perceive or apprehend thatprior to the accident the stairs were in a condition such that they were likely to collapse."

Furthermore, such a position is completely at odds with Court of Appeals precedent. InZimmer v Chemung County Performing Arts (65 NY2d 513 [1985]), the Court of Appealsexplicitly recognized that Labor Law § 240 (1) has an unvarying standard and "[t]he question of. . . circumstantial reasonableness is therefore irrelevant under subdivision 1 of section240" (id. at 523 [citation omitted]). Zimmer is perfectly in line with Gordon vEastern Ry. Supply (82 NY2d 555 [1993]), to which the majority cites for the proposition that"[t]o establish a prima facie case plaintiff need not demonstrate that the precise manner in which theaccident happened or the injuries occurred was foreseeable; it is sufficient that he demonstrate that therisk of some injury from defendants' conduct was foreseeable" (id. at 562 [emphasisadded]). Here the actionable conduct of defendants was failing to provide plaintiff withappropriate safety devices (see Zimmer, 65 NY2d at 522 ["a violation of section 240 [1]. . . creates absolute liability. The failure to provide such safety devices is such aviolation"]). Plaintiff has undeniably made out his prima facie case in that he was working in aconstruction site and was injured as a result of an elevation related risk. Defendants, in my view, haveutterly failed to demonstrate that plaintiff was afforded appropriate safety devices. It is simplyincongruent for the majority to cite to Gordon to support its holding that defendants here arenot liable under Labor Law § 240 (1). In Gordon, the plaintiff was at least provided aladder, which, albeit, proved inadequate.

The majority also astonishingly holds that inasmuch as permanent structures are not "normally"expected to collapse, defendants are not required to comply with the strict requirements of the statute.This position is a slippery slope that defeats the clear legislative intent to protect workers. Moreover,the grafting of a foreseeability element into section 240 (1) permits these blanket statements that apermanent structure of defendant's own choosing is not normally expected to collapse or fail evenwhen, as here, it does. Given the majority's holding, it is difficult to fathom the need for Labor Law§ 240 (1) since the elevated risk element of the statute is eliminated simply by defendant's claimthat although plaintiff's injury was the result of gravity, the occurrence was not "normal" and thereforethe defendant had no duty to protect its workers. Accidents are occurrences that by definition happenoutside the "norm."[*8]

Permanent structures, like temporary structures, are bound tocollapse depending on the nature of the work being done on the structure. Thus, as here, if thepermanent structure has been abandoned for three decades, and exposed to the elements, and thesupporting beams of the floors were loosened, the requirement of proper safety devices is based not onsome intangible element of foreseeability, but rather on the nature of the work (i.e., elevation-relatedconstruction).

As a final matter, the majority's flawed logic is further highlighted when in addressing plaintiff'sLabor Law § 241 (6) claim, it chooses to discredit the project manager's affidavit as tailored tosupport defendant's summary judgment motion and to oppose plaintiff's cross motion. However, tobuttress its position that there is a question of fact as to foreseeability, the majority incredibly assertsthat the project manager's later claim that the premises were inspected should be considered.

Footnotes


Footnote 1: The Court noted that "[a]nindependent intervening act may constitute a superceding cause, and be sufficient to relieve a defendantof liability, if it is of such an extraordinary nature or so attenuated from the defendants' conduct thatresponsibility for the injury should not reasonably be attributed to them" (id. at 562). But, that isnot the case here.

Footnote 2: This risk is evidenced in anothercase relied on by the majority, Espinosa vAzure Holdings II, LP (58 AD3d 287 [2008]). There, a construction worker on arehabilitation project sustained injuries when the sidewalk he was standing on collapsed into the cellarvault below. This Court held that summary judgment on Labor Law § 240 (1) was not warrantedinasmuch as there was an issue as to whether the collapse was foreseeable. The injury, I believe, mayhave been prevented were the statute strictly adhered to.


NYPTI Decisions © 2026 is a project of New York Prosecutors Training Institute (NYPTI) made possible by leveraging the work we've done providing online research and tools to prosecutors.

NYPTI would like to thank New York State Division of Criminal Justice Services, New York State Senate's Open Legislation Project, New York State Unified Court System, New York State Law Reporting Bureau and Free Law Project for their invaluable assistance making this project possible.

Install the free RECAP extensions to help contribute to this archive. See https://free.law/recap/ for more information.