Judd v Vilardo
2008 NY Slip Op 09676 [57 AD3d 1127]
December 11, 2008
Appellate Division, Third Department
As corrected through Wednesday, February 11, 2009


mWesley H. Judd et al., Respondents, v Kim A. Vilardo, Appellant, andWilliam F. Moore et al., Respondents, et al., Defendant. (And a Third-PartyAction.)

[*1]Bartlett, Pontiff, Stewart & Rhodes, P.C., Glens Falls (Karla Williams Buettner of counsel),for appellant.

Cynthia R. Amrhein, Burnt Hills, for Wesley H. Judd and another, respondents.

Matthew R. Ludemann, P.C., Glens Falls (Matthew R. Ludemann of counsel), for William F.Moore and another, respondents.

Spain, J. Appeal from an order of the Supreme Court (Dawson, J.), entered September 28, 2007in Essex County, which, among other things, granted the motion of defendants William F. Moore andJanet M. Moore for partial summary judgment adjudging that an easement by grant exists over certainreal property.

This real property dispute, dating back to the early 1990s, concerns the precise location of aneasement for ingress and egress (i.e., a right-of-way) across Coates Point, a 5.36-acre parcel of landthat partially extends into Lake George in the Town of Ticonderoga, Essex County. The Point wassubdivided in the 1980s necessitating rights-of-way for access from the highway to the subdivided lotsin issue. Prior to the subdivision, rights-of-way provided access to all of the campsites and cabins onthe Point from Baldwin Road, a public highway. On this, the third summary judgment motion directed atestablishing the existence and location of an easement allowing access to lots on the farthest section ofthe Point, Supreme Court ruled, correctly we find, that an easement by grant encumbers the lot nowowned by defendant Kim Vilardo, i.e., lot 15, enabling access to lot 1-B owned by plaintiffs and lot 2owned by defendants William Moore and Janet Moore. On Vilardo's appeal, we find that the Moores'smotion for partial summary judgment on its first cross claim (easement by grant) was properly granted,for reasons well stated in Supreme Court's decision and order establishing the location of theright-of-way encumbering lot 15.

Briefly, Mollie Cole, the former owner of the land comprising the Point, determined to sell most ofit to existing seasonal tenants who owned camps on the Point and paid her annual rent. To accomplishthis, Cole entered into a contract in 1985 (hereinafter the Cole contract) with four tenants, plaintiffs andNorman Liberty and Jane Liberty, pursuant to which Cole conveyed all of her property on the Point tothem; it was then subdivided into 15 lots, and plaintiffs and the Libertys deeded two lots back to Cole(now lots 14 and the disputed lot 15). Also in 1985, plaintiffs and the Libertys deeded the remaining 13lots to the newly formed Coates Point Association, created to oversee maintenance of the subdivisionand its rights-of-way. In 1988, Cole deeded the encumbered lot 15 to Vilardo, who tore down theexisting cabins and built a year-round home in 1991 with landscaping and accessories that effectivelyblocked vehicular access over the right-of-way to lots 1-B and 2. The Association thereafter deededthe respective lots to a number of Cole's former tenants, including lot 1-B to plaintiffs in 1989 and lot 2to the Moores in 2006, and all deeds were made subject to and benefitted by undefined existingrights-of-way over lot 15 and others.

Plaintiffs commenced this action against Vilardo in 2002 to reestablish their right-of-way over lot15, claiming that Vilardo had prevented access to their lot (1-B) and to lot 2 (now owned by theMoores). Vilardo has maintained throughout this protracted litigation that no right-of-way existed overlot 15 before 1985 or since, and that access to lots 1-B and 2 was by right-of-way over lots 3 (ownedby third-party defendants) and 1-B. In 2003, Supreme Court denied plaintiffs' motion for summaryjudgment, and the Moores and the Association were eventually brought into this action. In 2006, theMoores's initial motion for summary judgment was denied; the court held that they had proven that aright-of-way existed in 1985 in favor of lot 1-B and their lot 2, as depicted on a survey map preparedby Martin Thompson, a licensed surveyor. In 1985, Thompson had undertaken a field survey of thePoint as required by the Cole contract and [*2]had prepared the surveymap (hereinafter the 1985 Cole/Thompson survey map). The court concluded, however, that questionsof fact remained concerning the precise location of that right-of-way.

Ultimately, after five years of discovery, the Moores successfully moved for partial summaryjudgment after tendering additional documentary evidence establishing the exact location in 1985 of theright-of-way over lot 15. On appeal, we are unpersuaded by Vilardo's contention that questions of factpersist regarding the existence and location of the easement, or that further discovery is warranted.Evaluating the evidence most favorably to Vilardo, the nonmoving party, we agree with SupremeCourt's conclusion that the easement encumbers lot 15 as depicted on the 1985 Cole/Thompson surveymap (see Gilbert Frank Corp. v Federal Ins. Co., 70 NY2d 966, 967 [1988]; Zuckermanv City of New York, 49 NY2d 557, 560 [1980]), and that no material questions of fact remain.

The Moores, aided by plaintiffs and other subdivision lot owners, submitted extensiveproof—consisting of affidavits, survey maps, aerial surveys and photographs—establishingthat a right-of-way over the land later denominated lot 15 existed long before Cole's 1985 conveyancesand remained in regular use until Vilardo's 1991 impeding construction. Just prior to the 1985 Coleconveyance of the Point, plaintiff Wesley H. Judd had staked and plotted the planned subdivision lotsand access roadways then in existence, and drafted a map (hereinafter the Judd map) that was attachedto the Cole contract; it depicted, as relevant here, the existing private right-of-way road from BaldwinRoad across the planned subdivided lots, which road eventually forked, permitting access over lot 15 tolots 1-B and 2. Shortly after Cole's conveyance and the deed back to her of lots 14 and 15, Thompsonconducted a field survey, made field notes, and prepared the 1985 Cole/Thompson survey map thatdepicts a right-of-way across lot 15. Thompson's detailed field notes made during preparation for that1985 survey were submitted into evidence on this motion by the Moores at Supreme Court's suggestionin its prior decision; they were utilized in 2006 by Donald Pidgeon, a licensed surveyor, to create asurvey description of the precise centerline of the disputed easement. Pidgeon also prepared a surveymap (revised in 2007) from Thompson's field notes, establishing the location of the easement across lot15, consistent with the 1985 Cole/Thompson survey map. As Thompson attested in a 2007 affidavit,his field notes and survey map locate the easement existing in 1985 across lot 15 and allow access tothe peninsula, i.e., lots 1-B and 2. Other evidence submitted by the Moores supports the foregoing,which constituted the only objective evidence prepared at the time of the 1985 conveyancesestablishing the location of the existing easement granted to the lot owners by which their subdividedlots could be accessed from Baldwin Road.

Notably, in 1985 when plaintiffs and the Libertys transferred lot 15 back to Cole, the deed grantedCole a right-of-way over all of the grantors' land, i.e., across the entire Point to Baldwin Road, and alsoexpressly reserved the existing right-of-way to Baldwin Road "over the lands of the Grantee [Cole],"including lot 15. Then, in 1988, when Cole transferred lot 15 to Vilardo, it was expressly benefitted byan easement to Baldwin Road, and "[subject] to . . . easements . . .contained in prior instruments of record affecting said premises [lot 15]." That [*3]deed also specifically reserved "[a]n easement or right of way to thepublic highway (Baldwin Road) over the lands of Grantee [Vilardo]" (emphasis added).Likewise, all deeds out of the Association to the individual lot owners were benefitted by and subject tothe existing easements, to enable access to Baldwin Road. There is no dispute that the deed to theMoores specifically granted them an undefined right-of-way over lots 15 and 3, among others, toBaldwin Road, to be used in common with other members of the Association, as did the deed toplaintiffs.

"The extent and nature of an easement must be determined by the language contained in the grant,aided where necessary by any circumstances tending to manifest the intent of the parties" (Sambrook v Sierocki, 53 AD3d 817,818 [2008], quoting Raven Indus., Inc. vIrvine, 40 AD3d 1241, 1242 [2007] [internal quotation marks and citation omitted]). Whilethe easement granted in the Moore and Liberty deeds (and reserved in the lot 15 deeds) did not fix alocation for access over lot 15 (or any other burdened lot), relocation to another part of lot 15 was notattempted by Vilardo; in any event, relocation by Vilardo could not now be permitted for this undefinedeasement when, as here, it would frustrate the purpose of the easement's creation (see Chekijian v Mans, 34 AD3d 1029,1031 [2006], lv denied 8 NY3d 806 [2007]; see also Lewis v Young, 92 NY2d 443,452 [1998]; cf. Green v Blum, 13 AD3d1037, 1037-1038 [2004]). Indeed, Vilardo's construction on lot 15 appears to precluderelocation of the right-of-way to any other part of lot 15, and Vilardo does not seek to relocate theright-of-way over lot 15 but, rather, to eliminate it altogether. The Moores have demonstrated that theyand plaintiffs were granted a right-of-way for passage to their lots over lot 15 and that, consistent withthe intent of the common grantors, it be located without obstructions where it existed in 1985 (seeLewis v Young, 92 NY2d at 449).

Vilardo failed to tender evidence creating a factual issue with regard to the existence or location ofthe easement (see Gilbert Frank Corp. v Federal Ins. Co., 70 NY2d at 967). She submittedno objective, contemporaneous or deed-based proof that the easement that existed in 1985 was acrosslots 1-B or lot 3. Many of Vilardo's averments, e.g., that lot 2 was accessed via lots 1-B and lot 3 untila falling out among neighbors, are irrelevant to the legal issue here. Reliance upon a map prepared in1988 by Leo Kudlacik (which does not portray a right-of-way over lot 15) is misplaced, given that itwas prepared only as a subdivision map (of which lot 15 was not a part) and was revised in 1995 toshow the right-of-way over lot 15. Vilardo's limited proof simply failed to meaningfully refute themovants' affidavits, the Judd map, the 1985 Cole/Thompson survey map and the Pidgeon survey mapusing Thompson's field notes. Indeed, Vilardo's own submissions in her 1990 Department ofEnvironmental Conservation permit application support that finding. Her conclusions andunsubstantiated allegations are insufficient to defeat a prima facie showing (see Zuckerman v City ofNew York, 49 NY2d at 562).

We cannot agree that summary judgment should have been denied as premature based uponVilardo's desire to conduct further discovery, including depositions of plaintiffs and third-partydefendants. Such depositions were to be completed by June 1, 2007 and a note of issue filed by June30, 2007 (neither was achieved) pursuant to Supreme Court's extended scheduling order in this 2002action. Vilardo, having had ample time and opportunity to conduct disclosure [*4]in this action, cannot cite her own inaction as justification to deny thisthird summary judgment motion (seeMetichecchia v Palmeri, 23 AD3d 894, 895 [2005]; Mitchell v Atlas Copco N. Am.,307 AD2d 635, 636 [2003]). Having also failed to demonstrate that further discovery could beexpected to yield material and relevant evidence raising triable material issues of fact (cf. Spellburg v South Bay Realty, LLC, 49AD3d 1001, 1003 [2008]), we find that summary judgment was properly awarded to the Mooreson the easement by grant cross claim.

Mercure, J.P., Rose, Kane and Stein, JJ., concur. Ordered that the order is affirmed, with one billof costs.


NYPTI Decisions © 2026 is a project of New York Prosecutors Training Institute (NYPTI) made possible by leveraging the work we've done providing online research and tools to prosecutors.

NYPTI would like to thank New York State Division of Criminal Justice Services, New York State Senate's Open Legislation Project, New York State Unified Court System, New York State Law Reporting Bureau and Free Law Project for their invaluable assistance making this project possible.

Install the free RECAP extensions to help contribute to this archive. See https://free.law/recap/ for more information.